
Grid-Tie Solar.
The Lowest Cost per kWh.
Panels run the property by day and surplus is credited through JPS net billing. We prepare and submit the application.
Panels · Inverter · Net-billing application
Services / Solar & Battery
Grid-tie and hybrid solar systems designed around how much electricity you actually use, with lithium storage for outages and room to expand.

Kingston, right now
Typical-day estimate for a 5 kW system.
Every system starts from your consumption and your roof. We design it, install it, register it with JPS and stay on as the people who service it.

Panels run the property by day and surplus is credited through JPS net billing. We prepare and submit the application.
Panels · Inverter · Net-billing application

Lithium iron phosphate storage and a hybrid inverter carry your chosen circuits through outages and into the evening.
Hybrid inverter · LFP storage · Backup panel

Multi-inverter designs, critical-load panels and phased expansion for offices, clinics, schools and government buildings.
Multi-inverter · Critical loads · Phased growth
Consumption analysis, demand measurement and a written financial analysis.
Mounting, DC and AC works, surge and overcurrent protection, labelling, testing and as-built records.
Monitoring, fault diagnosis, warranty administration and maintenance from the people who installed it.
By day the panels run the building first, charge the battery with the surplus, and send what's left to JPS for a net-billing credit.
Inverters are wall-mounted with dedicated DC and AC disconnects, surge and overcurrent protection, and a labelled connection to your distribution board.

The same five steps on every solar job, from a single home to an institution.
Six to twelve months of JPS bills: real consumption, rate class and demand.
Roof structure, orientation, shading and the existing electrical installation.
Array, inverter and battery sizing, savings and payback, in writing.
Mounting, electrical works and protection, supervised by our own team.
Testing, monitoring set-up, a walkthrough, warranties and the JPS net-billing submission.
The National Housing Trust (NHT) offers loans that can be used for solar, including its SMART Energy Loan and Solar Panel Loan.
You apply to NHT directly. Loan terms and eligibility are set by NHT, so check the current details with them.
An itemised quotation for the system you choose, with the panels, inverter, battery and installation listed.
If your loan amount is capped, we can design to that amount and show how the system can grow later without being replaced.
It depends on how much electricity you use and how much of the bill you want solar to cover. We start from 6–12 months of your JPS bills. Upload one on the estimate page for a first answer.
It can. It comes down to battery size and which circuits are connected. Many clients back up essentials such as the fridge, lights, internet, fans and some AC; others, like the Medical Council of Jamaica, have their full working load covered.
Net billing lets a grid-connected system send surplus solar power to JPS in exchange for a credit on your bill. It needs an application and an approved installation. We prepare and submit the paperwork at handover.
It depends on the size of the system and the roof. Your written quotation includes the installation timeline.
Typically 30 years performance on panels and 5 years on inverters and batteries, depending on the equipment. Warranty terms are on every quotation.
Yes. We take on residential, commercial and institutional projects across the island.